Yankhuwa Khola Hydropower
Project (4.92 MW)

Developed by: Gorkha Hills Energy Pvt.Ltd.

Yankhuwa Khola Hydropower Project (YKHP 4.92 MW) is a ROR type of Hyrdopower Project which use combined flow of water from Yankhuwa Khola & Nakhuwa Khola both are the tributary of Arun River. The Project Area is located in Shadananda Municipality of Bhojpur District, Koshi Province of Nepal.
Project Boudary lies in between:
Easting: From 87º 09’00” E to 87 º 10’ 51” E
Northing: From 27º 15’ 41” N to 27 º 16’ 26” N

Curated News

No news available.