Yankhuwa-Nakhua Khola Hydropower Project (4.92 MW)
| Project Name | Yankhuwa Khola Hydropower Project |
|---|---|
| Location | Sadananda Municipality, Bhojpur |
| Coordinates | 27°15'41"N to 27°16'26"N 87°09'00"E to 87°10'51"E |
| Installed Capacity | 4.92 MW |
| Type of Generation | Run-of-River |
| Catchment Area | 65.0 km² |
|---|---|
| Design 100 yrs Flood | 317.07 m³/sec |
| 40% Dependable Flow | 2.99 m³/sec |
| Catchment Area | 36.0 km² |
|---|---|
| Design 100 yrs Flood | 207.45 m³/sec |
| 40% Dependable Flow | 1.77 m³/sec |
| Plant Design Discharge | 4.76 m³/sec |
|---|---|
| Total Gross Head | 128.00 m |
| Net Head | 122.00 m |
| Average Annual Energy | 28.21 GWh |
| Dry Season Energy | 4.40 GWh |
| Wet Season Energy | 23.81 GWh |
| Turbine Type | Francis Turbine |
|---|---|
| No. of Units | 2 |
| Rated Flow per Unit | 2.38 m³/sec |
| Turbine Efficiency | 91% |
| Rated Speed | 600 RPM |
| Generator Type | Synchronous, 3-Phase |
| Rated Voltage | 6.3 KV |
| Frequency | 50 Hz |
| Generator Efficiency | 97% |
| Powerhouse Type | Semi Underground |
|---|---|
| No. of Units | 2 |
| Transmission Voltage | 33 KV |
| Transmission Length | 4.0 km |
| Substation | Tumlingtar Substation |
| Construction Period | 24 Months |
|---|---|
| Total Project Cost | In Progress |
| NPV / IRR / B/C Ratio | In Progress |